Pelaksanaan Kegiatan Tahun Anggaran 2007

In The Year Budget 2007 Area Binamarga get the fund allocation equal to Rp 28.566.139.200 ( Twenty eight billion five hundreds six puluh six million one hundred three puluh nine thousands two hundreds rupiah). The budget used for the fund of 30 activity. activity – the activity to support the make-up of economics and transportation of Sub-Province Purbalingga.

Activity of Budget Year 2007 the divided to become 3 category that is:

1. Activity of Baru/Murni of Budget Year 2007
a. Routine Conservancy Walke and Bridge with volume :
• Walke as long as = 100 km
• Bridge counted = 40
b. Periodic Conservancy Walke with the volume= 10,500 km / 3 activity Package
c. Make-Up of Road;Street with the volume= 50,070 km / 20 activity Package
d. Bridge Development ( 3 x 5,00 ) m ( 35 x 1,75 ) m ( 30 x 4,00 ) m and ( 11 x 4,60 ) m = 4
e. Bridge Enlargement ( 5 x 4,00 ) m
2. Continuation activity / slide of Budget Year 2007
a. Periodic Conservancy Walke the pasca PHO [of] counted = 17 activity Package / joint streets
b. Make-Up of Road;Street of pasca PHO [of] counted = 35 activity Package / joint streets
c. Development of Bridge of pasca PHO [of] counted = 1
d. Enlargement of Bridge of pasca PHO [of] counted = 2
3. Activity of Penanggulangan of damage of pasca natural disaster:
a. Slide Repair Walke counted = 1 activity Package / 1 joint streets

From three activity category hence in the year 2007 can be finished as long as 60,77 kilometre joint streets executed with the Conservancy Activity / make-up of Street. Internode as long as 60,77 kilometre push the condition of joint streets by the end of Year 2007 becoming to have condition “ GOOD”. while for the activity of Development / Bridge enlargement woke up 5 bridge totally bridge length as long as 84,00 metre. Like previous year ( Budget Year 2006) in the year Budget 2007 also prioritize the activity location which not yet been touched a handling walke.

Tugas Bidang Bina Marga

Area Binamarga represent one of the area in On Duty Public Work of Sub-Province Purbalingga. Fundamental Duty and Function ( Tupoksi) of Area Binamarga relied on Perda Number 22 Year 2005. Pursuant to the perda hence Area Binamarga have the duty in realizing the following tupoksi:

1. Mission.

Realizing the condition of facilities and basic facilities walke the / settled bridge and function maximal serve the transportation requirement ( second mission DPUK )

2. Target.

The increasing of and looking after of condition of physical and functiona period to building service walke the / settled bridge.

Relate to the the duties hence Area Binamarga have the program in the form of Development Program, Make-Up of, Rehabilitating Road;Street and Sub-Province Bridge. The Program formulated in the form of activity which is adapted for location of each this Program consisted of the Conservancy activity Walke, Make-Up Of Road;Street, Development of Routine Conservancy and Bridge Walke and Sub-Province Bridge. Besides mentioned of Area Binamarga still has the duty to finish the previous year activity or referred also as slide activity. Handling sequence between activity started with lightest routine conservancy activity, periodic conservancy and make-up of road;street.

Pursuant To Decree ( SK) Number 77 year 1991 about Handling Procedure Walke the Sub-Province hence joint streets Sub-Province handled by lightest that is Routine Conservancy Activity Walke and Bridge. Routine Conservancy represent the activity coping to maintain the road;street function started from year second from construction work. Considering in character hence routine conservancy activity walke the and bridge. Conducted to handle the light damage to prevent the the damage become bigger. This matter require to be conducted to remember every big damage require the fund larger ones also. Routine Conservancy Activity must be done per annum up to service function walke assumed to finish as according to Age Plan the Road;Street ( 5-10 year after construction work). Mount the damage asphalt pavement handled with the Routine Conservancy around 0 – 20 % from wide joint streets surface.

If a period of/to helper have according to age plan hence road;street damage will be handled with the Periodic Conservancy activity. This Activity can be conductedif road;street damage cannot be handled with the routine conservancy activity. While activity is Make-Up of Road;Street activity to boost up the condition street become the joint streets which have better condition like land street become the gravel and walke the gravel become the road;street pave. Make-Up of road;street earn also if damage walke to need to rehabilitate and needed a handling totally like veneering work repeat.

last program Supporter activity the Solving of previous year Activity ( slide). Slide activity aim to to finish the administration up to taking over from activity which have finished done in the year previously. Besides solving of activity also meant to ensure that the work executor really looking after result of work during 6 first month;moon pasca taking over. From all especial activity done by Area Binamarga is name of the each activity named as according to its work location.

TUGAS BIDANG BINA MARGA

Area Binamarga represent one of the area in On Duty Public Work of Sub-Province Purbalingga. Fundamental Duty and Function ( Tupoksi) of Area Binamarga relied on Perda Number 22 Year 2005. Pursuant to the perda hence Area Binamarga have the duty in realizing the following tupoksi:

1. Mission.

Realizing the condition of facilities and basic facilities walke the / settled bridge and function maximal serve the transportation requirement ( second mission DPUK )

2. Target.

The increasing of and looking after of condition of physical and functiona period to building service walke the / settled bridge.

Relate to the the duties hence Area Binamarga have the program in the form of Development Program, Make-Up of, Rehabilitating Road;Street and Sub-Province Bridge. The Program formulated in the form of activity which is adapted for location of each this Program consisted of the Conservancy activity Walke, Make-Up Of Road;Street, Development of Routine Conservancy and Bridge Walke and Sub-Province Bridge. Besides mentioned of Area Binamarga still has the duty to finish the previous year activity or referred also as slide activity. Handling sequence between activity started with lightest routine conservancy activity, periodic conservancy and make-up of road;street.

Pursuant To Decree ( SK) Number 77 year 1991 about Handling Procedure Walke the Sub-Province hence joint streets Sub-Province handled by lightest that is Routine Conservancy Activity Walke and Bridge. Routine Conservancy represent the activity coping to maintain the road;street function started from year second from construction work. Considering in character hence routine conservancy activity walke the and bridge. Conducted to handle the light damage to prevent the the damage become bigger. This matter require to be conducted to remember every big damage require the fund larger ones also. Routine Conservancy Activity must be done per annum up to service function walke assumed to finish as according to Age Plan the Road;Street ( 5-10 year after construction work). Mount the damage asphalt pavement handled with the Routine Conservancy around 0 – 20 % from wide joint streets surface.

If a period of/to helper have according to age plan hence road;street damage will be handled with the Periodic Conservancy activity. This Activity can be conductedif road;street damage cannot be handled with the routine conservancy activity. While activity is Make-Up of Road;Street activity to boost up the condition street become the joint streets which have better condition like land street become the gravel and walke the gravel become the road;street pave. Make-Up of road;street earn also if damage walke to need to rehabilitate and needed a handling totally like veneering work repeat.

last program Supporter activity the Solving of previous year Activity ( slide). Slide activity aim to to finish the administration up to taking over from activity which have finished done in the year previously. Besides solving of activity also meant to ensure that the work executor really looking after result of work during 6 first month;moon pasca taking over. From all especial activity done by Area Binamarga is name of the each activity named as according to its work location.